Rp 1.200.000
SERVICE DESCRIPTION | Topographic Survey Facility With the Total Station method: Fast, accurate and powerful with EDM Prism distance up to 4000m Angle accuracy up to 2 or 5 seconds Fast distance measurement up to 0.9 seconds Optical magnification…
- Laboratorium Pantai dan Dinamika Pantai (LPDP) - Sub Laboratorium Uji Model Numerik
- KKB Mlati (Subandono Diposaptono)
Laboratorium Pantai dan Dinamika Pantai - BRIN Gd. Subandono Diposaptono - Kawasan BRIN Yogyakarta Mlati Jl.Grafika No.2 Sinduadi Mlati Sleman - D.I. Yogyakarta - 08119811589
- labipdpantai@brin.go.id
Topographic Survey Facility
With the Total Station method:
Fast, accurate and powerful with EDM
Prism distance up to 4000m
Angle accuracy up to 2 or 5 seconds
Fast distance measurement up to 0.9 seconds
Optical magnification 30x
-- P E N T I N G--- mohon mengisi Form Skenario Pengujian yang diunduh di berkas layanan, untuk diupload sebagai file data dukung Contact Person Layanan : 081228285500
Application Requirements:
With the Total Station method:
Fast, accurate and powerful with EDM
Prism distance up to 4000m
Angle accuracy up to 2 or 5 seconds
Fast distance measurement up to 0.9 seconds
Optical magnification 30x
-- P E N T I N G--- mohon mengisi Form Skenario Pengujian yang diunduh di berkas layanan, untuk diupload sebagai file data dukung Contact Person Layanan : 081228285500
Application Requirements:
- Photo
- Other Supporting File
File Name | File Size | |
---|---|---|
Service SOP file | 1.15 MB | |
Template Photo | 0 MB | |
Template Other Supporting File | 0 MB |