Rp 1.200.000


SERVICE DESCRIPTION | Topographic Survey Facility With the Total Station method:      Fast, accurate and powerful with EDM      Prism distance up to 4000m      Angle accuracy up to 2 or 5 seconds      Fast distance measurement up to 0.9 seconds      Optical magnification…

  • Laboratorium Pantai dan Dinamika Pantai (LPDP) - Sub Laboratorium Uji Model Numerik
  • KKB Mlati (Subandono Diposaptono)
    Laboratorium Pantai dan Dinamika Pantai - BRIN Gd. Subandono Diposaptono - Kawasan BRIN Yogyakarta Mlati Jl.Grafika No.2 Sinduadi Mlati Sleman - D.I. Yogyakarta
  • 08119811589
  • labipdpantai@brin.go.id
  • Service Unit: day
  • Service Duration: 1 Calendar Day
  • Service Quota Per Day: 1
  • Service Capacity: 1 day
  • Minimum Amount: 1
Marketing Office
Deputi Bidang Infrastruktur Riset dan Inovasi BRIN
layanan_sains@brin.go.id
Apply for Service
Topographic Survey Facility
With the Total Station method:
     Fast, accurate and powerful with EDM
     Prism distance up to 4000m
     Angle accuracy up to 2 or 5 seconds
     Fast distance measurement up to 0.9 seconds
     Optical magnification 30x

-- P E N T I N G--- mohon mengisi Form Skenario Pengujian yang diunduh di berkas layanan, untuk diupload sebagai file data dukung Contact Person Layanan : bond003@brin.go.id

Application Requirements:
  • Photo
  • Other Supporting File
File Name File Size
Service SOP file 0.39 MB
Template Photo 0 MB
Template Other Supporting File 0 MB