Paid


SERVICE DESCRIPTION | Small Rolling Mill with Furnace is intended exclusively for internal BRIN users. This service operates under the ELSA Points payment scheme. Use of the facility outside regular working hours requires completion of Form F-BRIN-02-02 (Application for Permission…

  • Lab Metalurgi-ORNM
  • KST Serpong (Bacharuddin Jusuf Habibie)
    KST. BJ Habibie Serpong gedung 225 dan 475
  • 081357308827
  • prm@brin.go.id
  • Service Unit: Contractual
  • Service Duration: 8 Hours
  • Service Quota Per Day: 1
  • Service Capacity: 1 Contractual
  • Minimum Amount: 1
Marketing Office
Deputi Bidang Infrastruktur Riset dan Inovasi BRIN
layanan_sains@brin.go.id
Apply for Service

Small Rolling Mill with Furnace is intended exclusively for internal BRIN users. This service operates under the ELSA Points payment scheme.

Use of the facility outside regular working hours requires completion of Form F-BRIN-02-02 (Application for Permission to Use Process Laboratories, Preparation Facilities, Workshops, and Other Facilities Outside Working Hours), which can be downloaded from the Laboratory Accessibility → Download Forms menu.

Internal BRIN personnel outside the ORNM Metallurgy Laboratory who wish to use this facility are also required to complete Form F-BRIN-02-05 (Laboratory Usage – Internal Personnel), available in the same menu.

Before using the facility, users must read the Standard Operating Procedure (SOP) and the sample requirements provided in the Service Documents.

Location:
B.J. Habibie Science and Technology Area (KST) Serpong, Building 225.



File Name File Size
Service SOP/Form file 0.18 MB